Search With Filters

(Click the arrow to minimize)
Filters

Guide Posts

Guide Posts are written articles with accompanying still photos and/or video clips, usually written by our team of expert Guides and Founders, who each have many decades of experience.

Camp-Cruising the Maine Coast in the Caledonia Yawl HOWDY

Camp-Cruising the Maine Coast in the Caledonia Yawl HOWDY

Tapering Molded Sheerstrake Endings, Step-By-Step

Tapering Molded Sheerstrake Endings, Step-By-Step

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 10 — Windshield, Trunk Cabin & Side Deck

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 10 — Windshield, Trunk Cabin & Side Deck

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 9 — Skylight, Floors, Bulkhead Repair

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 9 — Skylight, Floors, Bulkhead Repair

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 8: A New-Old Engine

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 8: A New-Old Engine

Basket Case: Restoring a Watch Hill 15 at D.N. Hylan’s

Basket Case: Restoring a Watch Hill 15 at D.N. Hylan’s

Wooden Boats from Tasmania, Part 2: Rescuing the 8-Meter Sailboat VARG

Wooden Boats from Tasmania, Part 2: Rescuing the 8-Meter Sailboat VARG

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 7: De-greasing, New Frame Ends, Replacing Rusty Bolts

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 7: De-greasing, New Frame Ends, Replacing Rusty Bolts

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 6 — Beginning to Repower

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 6 — Beginning to Repower

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 5, New Floor Timbers, Frames, and a Portside Repair

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 5, New Floor Timbers, Frames, and a Portside Repair

CREEK CRAWLER, A Simple Trailerable Houseboat by Havilah Hawkins

CREEK CRAWLER, A Simple Trailerable Houseboat by Havilah Hawkins

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 4: The Framing Party

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 4: The Framing Party

Surprise Me 

1,200 Miles in Eight Days – Seeing the Intracoastal Waterway by Outboard

1,200 Miles in Eight Days – Seeing the Intracoastal Waterway by Outboard

Dreaming of a Herreshoff Golden Ball, with Wayne Roberts

Dreaming of a Herreshoff Golden Ball, with Wayne Roberts

Building and Launching JIMMY D, a 32′ Cornish Gig from the “Champlain Longboats” Program

Building and Launching JIMMY D, a 32′ Cornish Gig from the “Champlain Longboats” Program

Voyaging Thru Time: Photographs from Penobscot Marine Museum, Part 3

Voyaging Thru Time: Photographs from Penobscot Marine Museum, Part 3

Tom Robinson’s Solo Row Across the Pacific – Update #9 – Peru to Penrhyn Island: A Brief Recapitulation

Tom Robinson’s Solo Row Across the Pacific – Update #9 – Peru to Penrhyn Island: A Brief Recapitulation

A Busy Day at the Victoria Classic Boat Festival

A Busy Day at the Victoria Classic Boat Festival

Roaming in ROAMER

Roaming in ROAMER

Tom Robinson’s Solo Row Across the Pacific – Update #12 – Penrhyn Life, Part 1 – An Introduction

Tom Robinson’s Solo Row Across the Pacific – Update #12 – Penrhyn Life, Part 1 – An Introduction

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 5, New Floor Timbers, Frames, and a Portside Repair

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 5, New Floor Timbers, Frames, and a Portside Repair

Restoring a Herreshoff Fishers Island 31, Part 10: Sailing

Restoring a Herreshoff Fishers Island 31, Part 10: Sailing