Search With Filters

(Click the arrow to minimize)
Filters

Guide Posts

Guide Posts are written articles with accompanying still photos and/or video clips, usually written by our team of expert Guides and Founders, who each have many decades of experience.

Tapering Molded Sheerstrake Endings, Step-By-Step

Tapering Molded Sheerstrake Endings, Step-By-Step

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 10 — Windshield, Trunk Cabin & Side Deck

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 10 — Windshield, Trunk Cabin & Side Deck

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 9 — Skylight, Floors, Bulkhead Repair

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 9 — Skylight, Floors, Bulkhead Repair

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 8: A New-Old Engine

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 8: A New-Old Engine

Tasmania & the Australian Wooden Boat Festival

Tasmania & the Australian Wooden Boat Festival

An Excerpt from ‘The Dinghy Cruising Companion,’ by Roger Barnes

An Excerpt from ‘The Dinghy Cruising Companion,’ by Roger Barnes

Resizing a Boat Design—Some Things to Think About

Resizing a Boat Design—Some Things to Think About

Wooden Boats from Tasmania, Part 3: Day Tripping North, then West

Wooden Boats from Tasmania, Part 3: Day Tripping North, then West

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 7: De-greasing, New Frame Ends, Replacing Rusty Bolts

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 7: De-greasing, New Frame Ends, Replacing Rusty Bolts

Herreshoff Classic Regatta of 2014—A Report from Bryan Burdick

Herreshoff Classic Regatta of 2014—A Report from Bryan Burdick

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 6 — Beginning to Repower

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 6 — Beginning to Repower

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 5, New Floor Timbers, Frames, and a Portside Repair

BONNY BRIDE Progress — Restoring a Wooden Lobster Boat, Part 5, New Floor Timbers, Frames, and a Portside Repair

Surprise Me